Water treatment Plant - Water supply from the Pinios reservoir (EIA 168):
This study constitutes the EIpAS of the water supply from Pinios reservoir to meet the needs of settlements in Ilia Prefecture. The project involves the construction of a water treatment plant (of processing capacity 42,509 m3/d), external aqueduct (of a total length of 120Km), 5 pump stations and 2 new water storage tanks. The 40year horizon of the served population is 141.655 inhabitants. The environmental impacts caused by the project were examined and appropriate measures in order to tackle these effects were suggested..
Assignment Authority: Municipality of Amaliada.