Environmental Reports

PERMITTING OF THE WORKING SITE FOR THE NEEDS OF THE PROJECT: “DIVERSION OF SOURES STREAM” TECHNICAL ENVIRONMENTAL ASSESSMENT

The Technical Environmental Assessment aims to the environmental permitting of a working site, for the needs of the main project of the water stream diversion of Ag. Aikaterini and Soures, at Thriasio Area. The total working site area, is around 20.000 m2, within the limits of the Municipality of Mandra in the Regional Unit of Western Attica, of the Attica Region.

Assignment Authority: Private

Technical Consultant for the assistance of the Road Infrastructure Directive to meet specific requirements regarding Environmental Issues, in the framework of the Major Project “PATRA-PYRGOS motorway” financial application . (C.S.6):

Technical Consultant for the assistance of the Road Infrastructure Directive to meet specific requirements regarding Environmental Issues, in the framework of the Major Project “PATRA-PYRGOS motorway” financial application . (C.S.6):

The subject of the Technical Advisory Services was to assist the Infrastructure Directorate of MI&T to meet the specific environmental requirements in the framework of the EU-funded project "Completion of the Patras-Pyrgos Motorway". Services include reporting and description of environmental issues such as risks associated with climate change mitigation measures and natural disasters and the assessment of greenhouse gas emissions impact of the project using appropriate mathematical models.

From the comparison of the results with the existing situation, appropriate conclusions were drawn. Environmental costs were also estimated from the construction and operation of the project based on European databases. Finally, a detailed reference was made to all environmental risks to the project due to climate change, the mitigation strategy was analyzed and its effectiveness was documented.

Assignment Authority: Ministry of Infrastructure and Transport, General Infrastructure Secretariat, Road Infrastructure Directive

Technical Environmental Study on the installation and operation of Concrete Production Plant/Unit within the boundaries of Rhodes Airport “Diagoras” to serve the projects of renovation and extension of Rhodes Airport (ER 167):

Technical Environmental Study on the installation and operation of Concrete Production Plant/Unit within the boundaries of Rhodes Airport “Diagoras” to serve the projects of renovation and extension of Rhodes Airport (ER 167)

The study concerns the installation and operation of a Concrete Production Plant/Unit to cover the needs of extension, renovation and maintenance of the airport. The Plant/ Unit will be installed within the boundaries of Rhodes Airport “Diagoras” (RHO) and its main purpose will be serving the new planned projects of renovation and maintenance of the airport.

Assignment Authority: Private

Technical Environmental Study on the installation and operation of Concrete Production Plant/Unit within the boundaries of Rhodes Airport “Diagoras” to serve the projects of renovation and extension of Rhodes Airport (ER 166):

Technical Environmental Study on the installation and operation of Concrete Production Plant/Unit within the boundaries of Rhodes Airport “Diagoras” to serve the projects of renovation and extension of Rhodes Airport (ER 166):

The study concerns the installation and operation of a Concrete Production Plant/Unit to cover the needs of extension, renovation and maintenance of the airport.

The Plant/ Unit will be installed within the boundaries of Rhodes Airport “Diagoras” (RHO) and its main purpose will be serving the new planned projects of renovation and maintenance of the airport.

Assignment Authority: Private

TECHNICAL ENVIRONMENTAL STUDY FOR THE CONCRETE WASTE MANAGEMENT UNIT IN THE AREA OF the construction site of the new Ptolemaida SEPS ,in the framework of DAET 211598/3.5.2012 as applicable (ER 165):

TECHNICAL ENVIRONMENTAL STUDY FOR THE CONCRETE WASTE MANAGEMENT UNIT IN THE AREA OF the construction site of the new Ptolemaida SEPS ,in the framework of DAET 211598/3.5.2012 as applicable (ER 165)

The new Ptolemaida SEPS (Unit V), has been positioned in the place of the exhausted Komanou mine of the Ptolemaida lignite field of the Municipality of Eordea of Kozani, with the activity of generating electricity with a mixed nominal capacity of 660 MWe with pulverized lignite fuel also providing a capacity of 140 MWth for district heating.The present study concerns the operation of a concrete waste management unit through the installation and operation of a self-propelled crusher, which will typically break unstructured/plain/unreinforced concrete parts, and in exceptional cases reinforced ones. The purpose of the installation of the unit is to reuse the residual concrete materials (residues from transportation barrels, damaged specimens, etc), used for building needs of the new Power Unit. The technical environmental study was implemented according to the provisions of paragraph 11 of article 11 of Law 4014/2011.

Assignment Authority: Private

Technical Environmental Study on the operation of a Recycling Unit for Excavation, Construction & Demolition Waste within the framework of the “Faliro Delta Revamp Project” (ER 164):

Technical Environmental Study on the operation of a Recycling Unit for Excavation, Construction & Demolition Waste within the framework of the “Faliro Delta Revamp Project” (ER 164)

The present study concerns the installation and operation of a Recycling Unit for Excavation, Construction and Demolition Waste, (for short RECD) which will carry out the Exploitation of non-hazard solids and wastes from related to RECD waste streams, coming from the construction works. The purpose of the operation of this unit, will be the alternative management and the support of the completion of the remaining phases of the project in accordance with the timetable and the material management program that has been prepared.

Assignment Authority: Private