Environmental Reports

Provision of technical advisory services to assist the Mnistry, in the consolidation and codification of Environmental Terms for the PATHE concession project Section: Maliakos - Kleidi (C.S.1)

Provision of technical advisory services to assist the Mnistry, in the consolidation and codification of Environmental Terms for the PATHE concession project Section: Maliakos - Kleidi (C.S.1):

The subject of the Technical Advisory Services was the uniform environmental examinationof the concession project of PATHE (Maliakos-Kleidi section) with a total length of 230 Km. For this project all the necessary technical studies as well as the related Environmental Impact Assessment Studies have been elaborated, in parts from 1993 to 2003, and the relevant DAETs(16 JMDs) were issued. The subject of the Services was the consolidation and codification all of the aforementioned studies and DAETs.

 

 

Assignment Authority: MEPW-Specific Service of Public Works (SSPW)

Αpproval Number: MEPW-SSPW/12-12-2004

Access trail to the Holy hermitage of St Nikanoras (ER 159)

Access trail to the Holy hermitage of St  Nikanoras (ER 159):

This is a report prepared in the course of implementing the Environmental Terms of Ilarion and involves the construction of footpath on the northeastern shore of the river, of a total length of approximately 300m, which leads from the monastery Zabordas to the North abutment of a footbridge. The purpose of this report is to exempt the project from the process of environmental licensing as described in L.4014/2011. The trail is functionally incorporated into the  projects to protect and rescue the cloister of Saint Nikanor, which are implemented, as mentioned above, in the context of compliance with the approved environmental  terms of Ilarion Hydroelectric Project.

Assignment Authority: PPC S.A

Study of a sewerage system for the southwestern district of Salamina City (ER 158)

Study of a sewerage system for the southwestern district of Salamina City (ER 158):

This is a report for the construction of a sewerage pipeline system of  the southwest expansion area of town of Salamis  up to the  central pumping station of the  city of Salamis. The project includes a twin pipeline of sewage from the pumping station A to the central pumping station of the city of Salamis and thereafter to the Central Wastewater Treatment Plant of Psitalia.. The project is designed to serve 550  inhabitants (population equivalent) for the year 2012,  4850 for the year 2032 and 5.530 pe for the year 2052 (40 years).

Assignment Authority: Municipality of Salamis

TEMPORARY STRUCTURES FOR THE IMPLEMENTATION OF PROJECTS FOR PROTECTION AND ACCESS TO THE HOLY HERMITAGE OF NIKANORAS (ER 157)

TEMPORARY STRUCTURES FOR THE IMPLEMENTATION OF PROJECTS FOR PROTECTION AND ACCESS TO THE  HOLY HERMITAGE  OF  NIKANORAS (ER 157):

This is a report prepared in the framework of the implementation of Environmental Terms of Ilarion Hydroelectric Project. The study is related to the temporary works, which are necessary  in order to implement the project of protection and access  to the Holy Hermitages of Saint Nikanor, lying on the north bank of Aliakmon river,  of the municipality of Grevena.

These temporary works are: a)  construction of a teleferique (~ 300m) to transport materials and equipment from a position upstream of the southern shore (opposite side) of Aliakmon river and b) the access road (~ 695m) from the Provincial Road (EO) Paliouria - Elati to the teleferique. The report is intended to exempt these temporary works  from the process of environmental licensing as described in L.4014/2011.

Assignment Authority: PPC S.A

 

ENVIRONMENTAL MONITORING of the OPERATIONAL PROGRAMME “ENVIRONMENT & SUSTAINABLE DEVELOPMENT” (OPESD) for year 2011 (ER 156)

ENVIRONMENTAL MONITORING of the OPERATIONAL PROGRAMME “ENVIRONMENT & SUSTAINABLE DEVELOPMENT” (OPESD) for year 2011 (ER 156):

In 2011 the activity of OPESD intensified even more compared to previous years even compared to year 2010, resulting in admission to the program of numerous acts.

This report aims to the environmental assessment of this activity.

Assignment Authority: MEECC-OPESD

 

ENVIRONMENTAL MONITORING of the OPERATIONAL PROGRAMME “ENVIRONMENT & SUSTAINABLE DEVELOPMENT” (OPESD) for year 2010 (ER 155)

ENVIRONMENTAL MONITORING of the OPERATIONAL PROGRAMME “ENVIRONMENT & SUSTAINABLE DEVELOPMENT” (OPESD) for year 2010 (ER 155):

This is the annual environmental monitoring report for the year 2010,  of the OPESD 2007-2013. The annual environmental monitoring aimed at identifying the figures and indicators related to the programme  activities and representing  potential environmental changes. In 2010 the activity of OPESD intensified significantly compared to previous years, resulting in admission to the program of numerous acts. This report aims to environmental assessment of this activity, while attempting to build on the experience collected from the reports of previous years and build a coherent system for recording and calculating the environmental indicators that can be utilized in future years.

Assignment Authority: MEECC-OPESD