Environmental Reports

Environmental impact study on Lachi stream, Local Community of Lachi, Prefecture of Lakonia (ER153)

Environmental impact study on Lachi stream, Local Community of Lachi, Prefecture of Lakonia (ER153):

It is a report aiming to the examination of the various alternatives,  in order to be decided by the contracting authority, the optimal solution should be adopted, to achieve the twin goals of the project ie the settlement of the defined stream bed and the simultaneous construction of a connecting road between the municipal and provincial road, in order to facilitate the passage of vehicles.

Prepared fοr: Municipality of Monemvasia

New water tank for domestic water supply in Paliouria (ER 152)

NEW WATER TANK  FOR DOMESTIC WATER SUPPLY IN PALIOURIA OF THE MUNICIPALITY OF DESKATI (ER 152):

This report concerns the assessment and evaluation of environmental impacts from construction and operation of new water tank for domestic water supply, in the Local Community of Paliouria,   of the Municipal Unit of  Deskati. In the area a new domestic water network is going to be built, which was approved environmentally by  the DET No. 52834/2236/5-10-2011. Since this tank was not included in the initial design, a study was implemented in order to include this project in the  whole environmental licencing of the project.

Prepared fοr: PPC S.A

Exploration of environmental problems in the framework of partial diversion of Acheloos to Thessaly (ER 151)

Exploration of environmental problems due to works of safety and risk management, in the framework of partial diversion of Acheloos to Thessaly (ER 151):

Two special experts, environmentalists, were engaged by the MITN focused on the investigation of environmental problems that will arise from proposals of technical solutions for safety and risk management, of partial diversion of the upper reaches of Achelous river to Thessaly. The purpose of our work was to assist the experts and the Ministry, in facing the environmental issues  arising from these proposals.

Prepared fοr: MITN-GSPW

STUDY of CHALKIDA – KIMI HIGHWAY (INLAND LAYOUT) (ER 150)

STUDY of CHALKIDA – KIMI HIGHWAY (INLAND LAYOUT)  (ER 150):

This report was prepared under a tender process in order to demonstrate the main environmental issues associated with the implementation of the proposed road development solution. Three different options were completed and have been evaluated from an environmental point of view. The solution examined in this study ranked first among the 3 solutions proposed by different consulting schemes.

Prepared fοr: MITN-GSPW

Elaiourgiki (Olive oil production) A.II.3 ACTION: Intervention studies in traditional olive groves in west Attica (Megara plain) (ER 149)

REG 867/2008/EEC Elaiourgiki (Olive oil production) A.II.3 ACTION: Intervention studies in traditional olive groves in west Attica (Megara plain) (ER 149):

The purpose of this project is, to record the characteristics of the primary sector of West. Attica and to examine various alternatives for implementing the program REG (EC) 867/2008 in the region as well as to suggest the best intervention, to achieve the broader goal of the program, which is to improve the physical and especially the agricultural environment in the study area, in the context of sustainability. In the framework of this, a workshop was organized, aiming to identify and assess problems and interventions which can be implemented in traditional olive groves.

 

Prepared fοr: Elaiourgiki SA

 

Road sub-section in Kaiafa area, of the road section Amaliada-Pirgos–Tsakona (ER 141)

Road sub-section in Kaiafa area, of the road section Amaliada-Pirgos–Tsakona of the Motorways of Eleusina-Corinth-Patras -Pyrgos-Tsakona (ER 141):

This study was prepared after the suspension decision  of the Decision of Environmental Terms, by the Hellenic Supreme Court  for the road  sub-section near the lake Kaiafa.  The sub-section is located between the interchanges implemented under the Concession Agreement  I/C Samiko and I/C Zaharo. The total length of sub-section is 8,5 Km. Specifically, this study traces the history of alternatives which had been considered in previous technical and environmental studies, evaluates and recommends one of the alternatives as "optimal" from an environmental point of view ,based on current environmental data.

Assignment Authority: MEPW-GSCW/SSPW/PCP