Environmental Reports

Conversion of Markopoulo Olympic shooting settlement in a police officer’s building. (ER 133)

Conversion of Markopoulo Olympic shooting settlement in a police officer’s building. (ER 133):

The Environmental Report aims to the environmental licensing of the usage change of the shooting facilities, so that they properly accommodate the Police Services.

 

Assignment Authority: Olympic Properties S.A.

 

 

Suburban Rail Line Stavros - Rafina (Phase A)/Rail Connection with the Port of Rafina (ER 128)

Suburban Rail Line Stavros - Rafina (Phase A)/Rail Connection with the Port of Rafina (ER 128):

This report is the environmental review, as an annex of the Preliminary Study for the project. Its purpose is to highlight points of environmental interest in both in the adjacent and in the wider area of the proposed rail line, and a first assessment of the environmental impacts that may arise from the implementation and operation of the project.

Assignment Authority: Privatel

 

Environmental report for the creation of an Industrial Area at "Shisto" -Perama municipality (ER 120)

Environmental report, for the concession of an 2.1 ha area at "Shisto" -Perama municipality, in the HBID SA for the creation of an Industrial Area (ER 120):

 

The project involves a concession area, of 2.1ha in HGBID SA, with exclusive purpose of creating an industrial park. This study is the Environmental Report required for  the process of environmental licensing of the abovementioned project.

Assignment Authority: SHISTO INDUSTRIAL AREA

 

Renewal of Environmental terms approval for the construction and operation of projects in Smokovo dam (ER 115)

Renewal of Environmental terms approval for the construction and operation of projects in Smokovo dam as well as of the associated works in Karditsa county (ER 115):

An essay was submitted for the renewal of the Environmental Terms Approval Decision of the JMD 22978/17-5-1996. Its purpose is to identify and propose any changes in the approved environmental conditions of the project if, for some documented reason, the environment is inadequately protected.

Assignment Authority: MEPW/SSPW

Direct interventions on the riverbed of Giannoula stream (ER 114)

Direct interventions on the riverbed of Giannoula stream (ER 114):

The works concern the direct interventions to be made to the riverbed of Giannoula stream in order to confront potential flood risks due to the incineration of large forest areas in Parnitha in the summer of 2007, a substantial part of which flows to this stream. An Environmental Report was submitted in order to exempt these projects from the process of environmental licensing.

Assignment Authority: MEPW /SSPW

Flood protection study at Faliro Delta (ER 113)

Flood protection study at Faliro Delta (ER 113):

This project will serve the flood protection of underground passages and roads in the Faliro Delta. This environmental report intends to exempt from the environmental licensing the construction and operation of the project.

Assignment Authority: MEPW – Direcorate General for Hydraulic Works for the Prefecture of Attica (D10)