Highway Patras-Pyrgos-Tsakona, section Patra - Amaliada (ER 145)

Highway Patras-Pyrgos-Tsakona, section Patra - Amaliada.Improvement of sub-section Mintilogli - Kato Achaia (ER 145):

Highway Patras-Pyrgos-Tsakona, section Patra - Amaliada. Improvement of sub-section Mintilogli -Kato Achaia (ER 145): This reports was prepared in order  to examine and evaluate the environmental impacts of alternatives and variations of the initial planning of the highway,  which was approved by JMD DET No. 102696/30.05.06. Following the comparative evaluation of alternatives, one specific alternative, of a total length of 16.9 km, was proposed.

Assignment Authority: MITN -SGCW/SSPW

Supplementary Environmental Study for the Olympic facilities (TES 111)

Supplementary Environmental Study for the Olympic facilities: Elliniko Olympic complex (main and ancillary facilities: basketball, fencing, hockey, baseball, softmpol) and Elliniko Olympic Canoe - slalom Center (TES 111):

The study’s purpose is to evaluate the environmental and land-planning impacts from the reactivation and upgrading of the existing sport and recreational facilities of the Olympic Pole in Elliniko.

This work took place to support the company "Olympic Properties SA” for the relevant law voting in parliament.

Assignment Authority: Olympic Properties SA

 

 

Water tanks at Porto – Rafti & Markopoulo municipality (TES 101 & 102)

Water tanks at "Chavosi" or "Vigkleza” and “Limithi" or "Margariteza" of Porto – Rafti, Markopoulo municipality in Mesoghaia (TES 101 & 102):

These two studies concern two water tanks for domestic water supply,  of 500 m3 capacity for the water  needs of Porto Rafti settlement.

Assignment Authority: Markopoulo Municipality

Short-term measures for the confrontation of the landslide in the Selinario area of NRAC (ER 108)

Short-term measures for the confrontation of the landslide in the Selinario area of NRAC (ER 108):

This study constitutes the environmental revision essay of the abovementioned project. It concerns a small-scale technical project of 1.5 kilometers length in Lassithi county. Within the project area there is a need for immediate measures due to intense sliding phenomena of the slopes making road traffic highly dangerous.

Assignment Authority: MEPW-SSPW/NRAC

Extension of line 2 - Section of Ag. Antonios - Anthoupoli. Construction Materials Management (ER 109)

Extension of line 2 - Section of Ag. Antonios - Anthoupoli. Special Study of Excavation and Construction Materials Management (ER 109):

The study made suggestions for the management of excavated materials and construction materials, and management of all waste (solid - liquid) that would result from construction of the project

Assignment Authority: ATHENS METRO

Environmental impacts from existing activities in the municipality Markopoulo (ER 116)

Study assessment and evaluation of environmental impacts from existing activities within the municipality Markopoulo (ER 116):

The report aims to comment and formulate an informed opinion to Markopoulo municipality in relation to the studies on rehabilitation of quarry aggregates of two companies in the position Merenta of Markopoulo municipality.

Assignment Authority: Markopoulo municipality