Renewal- Amendment Environmental Impact Assessment Studies

RENEWAL AND AMENDMENT OF THE DAET OF THE AIRPORT OF RHODOS, FOR THE TEMPORARY ESTABLISHMENT AND OPERATION OF A WASTE TREATMENT PLANT

This assessment aims to the environmental permitting of an additional temporary location for the establishment and operation of a waste treatment plant (C&D waste), within the limits of the airport. The purpose of this plant is to serve the treatment of the waste generated from the scheduled airport extension works. The unit will be established to the northwestern part of the runway, at a total area of 38.500 m2.

Assignment Authority: Private

ENVIRONMENTAL IMPACT ASSESSMENT OF THE FLOOD PROTECTION PROJECT OF “KORINTHOS – PATRA” HIGHWAY

The aim of this study was to examine the environmental impacts and propose appropriate mitigation measures for 32 individual technical projects for flood protection, at the areas surrounding the Korinthos-Patra Highway and within the limits of the Concession Project.

Assignment Authority: APION KLEOS SA

AMENDMENT OF THE DAET OF THE ROAD SECTION “I/C NEA MOUDANIA – POTIDAIA BRIDGE” OF EGNATIA ROAD

This study concerns the project of construction and operation of the road section I/C Nea Moudania- Potidaia Bridge” (Section 58.4.1) of the vertical axis 58, of Egnatia Odos road . The aim of the amendment was to examine the environmental impacts and propose appropriate mitigation measures for the following works:

• extension of the road section to include the N. Moudania I/C,

• new design of the N. Moudania I/C and

• new service roads (SR1 195m and SR2 277m)

Assignment Authority: EGNATIA ODOS SA

RENEWAL OF THE DAET (138522/10-4-2009) OF THE PROJECT: “400KV TRANSMISSION LINE FOR THE INTERCONNECTION OF THISVI HVS WITH THE NATIONAL SYSTEM

The project, which has been constructed and operating since December 2010, concerns the construction and operation of a High Voltage Station (HVS within the limits of the industrial area of Thisvi) and the 400KV electric power transmission line of a total length of approximately 20 km interconnecting the HVS with the National System (left circuit of the 400KV transmission line Athina – Acheloos).

Assignment Authority: ELPEDISON SA

RENEWAL AND AMENDMENT OF THE DAET OF THE ROAD SECTIONS “I/C KLEIDI – I/C KALOCHORI” & “JUNCTION DERVENI – NIMPHOPETRA” OF EGNATIA ROAD

The aim of this project is the environmental permitting of one (1) new Side Toll Station of the road section I/C Kleidi – I/C Kalochori (7.0) and two (2) new Side Toll Stations of the road section “Junction Derveni – Nimphopetra (9.0)” of Egnatia Road.

Assignment Authority: EGNATIA ODOS SA

RENEWAL AND AMENDMENT OF THE DAET OF THE ROAD SECTION “STRIMONAS RIVER – N. PERAMOS” & “VANIANO – IASMOS” OF EGNATIA ROAD

The aim of this project is the environmental permitting of two (2) new Side Toll Stations, within the road section “Strimonas river – N. Peramos” (12.0) and two (2) within the road section “Vaniano – Iasmos” (14.2.2 & 14.2.3), both within the limits of expropriation of Egnatia Road.

Assignment Authority: EGNATIA ODOS SA