Additional-Amending Environmental Impact Assessment Study for the construction and operation of the adjustment projects of Sarantapotamos torrent at Thriasio Field (EIAS 142):
This study constitutes an Additional – Amending Environmental Impact Assessment Study of the project. The project has a total length of 2490 m (from K.P. 0+900 to K.P. 3+390 at the crossing of Sarantapotamos torrent with Souris torrent). The aim of this study is to amend the environmental licensing of the project, with the new design facts, which emerged during the final design studies.
Assignment Authority: MEPW
Αpproval Number: 123908/20-12-04