The study’s purpose was to examine and evaluate the environmental impacts of of an alternative, to the one approved by the No. 100163/30-5-2006 JMD DET, solution, of the project "Motorway of Patras-Pyrgos-Tsakonas, Section Amaliada-Pirgos-Tsakona". The corresponding section, in which the alternative was considered, is located among the KP 61 560 and KP 64 860 and has a total length of approximately 3,3 km.
Assignment Authority: MITN -SGCW/SSPW/PCP
pan class=hps>sediment and local strengthening of existing rock outbursts, which eroded their base because of wave action and geological background , is foreseen
Assignment Authority: Region of Peloponnese - Directorate of Technical Works