Upgrading the North Road Axis of Crete (NRAC) into a motorway. Section Panormos–Exanti junction Prefecture (EIAS 206 & 206B):
These studies constitute the EIpAS and the EIAS of the construction and operation of the road section Panormos-Exanti junction in the framework of the refurbishment and upgrade of the NRAC into to Motorway. The under study road section belongs to the National Road network and serves the supra-local traffic between Western and Eastern Crete. The under study section has a length of about 10Km. Engineering works also include the formation of 1 Interchange at Panormos area and the construction of 1 bridge of span 221 m. Special attention was given in the localization of appropriate disposal sites for the excess material of earth works.
The environmental impacts of the project were examined and evaluated and appropriate measures in order to tackle these effects were suggested.
Assignment Authority: MEPW-SSPW/NRAC
Αpproval Number EIpAS: 128584-26/6/07