Construction and operation of a small hydroelectric plant on the river bed of Arachthos (EIAS 218)

Construction and operation of a small hydroelectric plant of 5 MW in the location Helliniko on the river bed of Arachthos (EIAS 218):

This study constitutes the EIpAS of the construction and operation of a Small Hydroelectric Plant of 5 MW maximum net power, on the river bed of Arachthos in the Prefecture of Ioannina. The plant is of Run – Of the River (ROR) type without reservoir. In the study, the environmental impacts of the project were examined and evaluated and appropriate measures in order to tackle these effects were suggested.

Assignment Authority:  Private

Construction and operation of the hydroelectric plant of Elafi on Aliakmonas river (EIA 219)

Construction and operation of the hydroelectric plant of Elafi on Aliakmonas river in the Prefecture of Grevena (EIA 219):

This study constitutes the EIpAS of the construction and operation of Elafi Hydroelectric Plant of PPC on the river bed of Aliakmonas in Grevena Prefecture. In the study, the environmental impacts of the following engineering works were examined and evaluated and appropriate measures in order to tackle these effects were suggested: An earthen dam of 110m maximum height with clay core, a reservoir with total capacity of 1.112x106m3 and area of 3827ha, a diversion tunnel of 900m length, an open spillway with gates with maximum flood capacity of 3.150 m3/sec, an outdoor power station with an installed capacity of 135MW, a downstream reregulating tank with capacity of 4x106m3, rehabilitation of local road network of 13,5Km length, construction of 3 bridges of 1300m total span.

Assignment Authority: PPC S.A.

Study for the construction of the new railway line Kalambaka – Kozani (EIAS 220)

Study for the construction of the new railway line Kalambaka – Kozani, Section Dimitra - Siatista (first phase) (EIAS 220):

This study constitutes the EIAS of the above project. This study is part of a broader planning for the development of the rail network in Greece, through the construction of the so-called «Rail Egnatia». The project involves the construction and operation of single line high-speed railway of the Dimitra- Siatista section of the new railway line Kalambaka - Kozani. The line will service both passenger and freight trains. The total length of the railway track of the under study section is 46Km. Also, the project involves the construction of vertical and side roads of length 40Km. The following technical works are also foreseen 28 bridges of total length 5Km, 16 tunnels of total length of 11Km, 2 Cut & Cover of total length of 330m and 3 Rail Stations: Dimitra, Mikrokleisoura, Siatista.

In the study, the environmental impacts of the project were examined and evaluated and appropriate measures in order to tackle these effects were suggested

Assignment Authority: HRO S.A.

Construction and Operation of the New Prefectorial General Hospital of Zakynthos (EIAS 131&131Β&131C)

Construction and Operation of the New Prefectorial General Hospital of Zakynthos (EIAS 131&131Β&131C):

These studies constitute the EIpAS and the ΕIAS of the New Prefectorial General Hospital of Zakynthos. The land, on which the hospital is going to be built, has a total surface area of 2,44 ha and is located in Zakynthos municipality at a distance of 12 km from the city of Zakynthos. Within this plot, the hospital of total capacity of 130 beds and flloor area of 14.950 m2, is going to be built. The buildings will have 3 floors of total height of approximately 16,5 m. The environmental impacts caused by the construction and operation of the project were examined and evaluated and appropriate measures to tackle these effects were suggested. In 2013 the Renewal of no 17954/11-11-2003 AET was implemented

 

Assignment Authority: DΕPΑΝΟΜ SΑ

Αpproval Number EIpAS: 15930/09-10-2003, Αpproval Number EIAS: 17954/11-11-2003

Upgrading the North Road Axis of Crete (NRAC) into a motorway. (EIAS 132)

Upgrading the North Road Axis of Crete (NRAC) into a motorway.Sisi Interchange (I/C 4) (ΕIAS 132 & 132Β):
These studies constitute the EIpAS and the EIAS of the construction and operation of Sisi Interchange (I/C 4) on NRAC. The NRAC is the main road connecting Crete and it crosses the entire northern part of the island from Kissamos in the western edge to Sitia in the eastern one. NRAC is part of the Greek national road network. In the framework of the project a PARCLO shape Interchange on NRAC is implemented along with the reconstruction of the local road network and the Old National Road Agios Nikolaos – Herakleion that is located at a short distance from NRAC. Engineering works also include the formation of 3 at-grade intersections on the local network, the construction of 2 small bridges and the reconstruction of an existing one. The total length of road works is 3,5km. Particular emphasis was given to assess and evaluate the impact on bird life, since the area of the gorge Selinari is protected due to the presence of significant and protected bird species (declared SPA - Special Protection Area for bird life on the basis of Directive 79/409/EE). Within the framework of the study, a specific study of landscape planting of the Interchange was also conducted.
 
 

Assignment Authority: MEPW

Budget: 2.120.000€

Αpproval Number EIpAS: 123072/05-04-2004



oad Study "Kastri - Agios Petros - Malevi - Astros" (EIAS 133)

Road Study "Kastri - Agios Petros - Malevi - Astros Section: I/C to Hadakia - I/C to Terzaiika (EIAS 133):

This study constitutes the EIAS of the project. The street is located on the east side of the Prefecture of Arcadia and stretches in the limits of the City of North Kinouria. The technical object under study concerns the improvement of the road section of Kastri - Agios Petros - Malevi - Astros from Hadakia interchange to Terzaiika interchange. The proposed road development follows the existing road both horizontally and hypsometrically, significantly improving its geometrical characteristics.

The studied road was split into two subsections, because of the insertion in the middle of Agios Ioannis village, in which there has been no improvement, due to the fact that it is classified as a traditional settlement. The total project length is about 10,7 km. In the study, the environmental impacts caused by the construction and operation of the project were examined and evaluated and appropriate measures of treatment were suggested. Particular emphasis was given to assess and evaluate the impact on vegetation and flora, given that the project is at the northern boundary of the protected area NATURA, Tops of Mountain Parnonas and the Malevi monastery area (code GR 2520006)

 

Assignment Authority: Prefecture of Arcadia – Directorate of Infrastructure