Building for Housing the Services of the Division of Criminal Investigation of Greek Police (EIAS 268)

Building for Housing the Services of the Division of Criminal Investigation of the Greek Police Headquarters (EIAS 268):

This study constitutes  the EIAS of the construction and operation of a new building of total floor area of 1,7 ha in a plot of 0,8 ha, in the industrial area near the Academy of Plato in the Municipality of Athens. The study examined and evaluated the environmental impacts of the project and proposed appropriate remedies.

Assignment Authority: State Mortgage Company

Study on the connection of the new railway line Kalambaka - Kozani (EIAS 270)

Study on the connection of the new railway line Kalambaka - Kozani, Section Demetra - Siatista with Grevena (EIAS 270):

The project involves the construction and operation of single line high-speed railway that will service both passenger and freight trains. The total length of the railway track of the under study section is 9Km. The following technical works are also foreseen: 5 bridges of total length 0,8Km, 1 tunnel of total length of 530m and 1 Rail Stations (Grevena). In the study, the environmental impacts of the project were examined and evaluated and appropriate measures in order to tackle these effects were suggested

Assignment Authority: HRO S.Α.

Flour milling industry of "LOULIS MILLS SA (EIAS 271)

Flour milling industry of "LOULIS MILLS SA (EIAS 271):

This study constitutes EIAS for the amendment of the existing environmental terms of the aforementioned industrial unit. The amendment relates to changes regarding to the existing buildings of the facility (demolition of existing buildings and building new ones), to the change of the installed equipment, and the construction and operation of a new mill in the place of the two existing ones. The under study flour milling industry is an IPPC industry (falls within the provisions of the 96/61/EEC Directive). The finished product (flour and byproducts) production capacity of the unit is 600 tn per day. The installed power of the unit is 3800hp and installed heat output capacity is 250kW. The unit is located in a plot with area of 1,1 ha in Keratsini, Piraeus.

Assignment Authority: Private

Connection of Peripheral Road with K3 Interchange of Sychena in Patras Wide Bypass (EIAS 272)

Connection of Peripheral Road with K3 Interchange of Sychena in Patras Wide Bypass (EIAS 272A & 272B):

This study constitutes the EIpAS and the EIAS of the abovementioned project, which consists of two distinct parts: the road connecting the Small Peripheral with K3 I/C of Sychena in Wide Patra Bypass and the interchange K3 of Sychena of Patras Bypass. The connecting road is an improvement of existing road Milihou takes over most of the same name along with the stream. The flyover K3 Sychena a new hub of Patras Bypass (SPP), which provided both the current GIS the city, and from being adopted. The length of all road sections are ~ 4,8 km.

Assignment Authority: Region of Western Greece

Study to improve National Road Sparta-Gythion (EIAS 273)

Study to improve National Road Sparta-Gythion (in sections) (EIAS 273):

This study constitutes the EIpAS of the improvement and reconstruction of the existing National Road Sparta – Gytheio over a length of 24Km.  Engineering works also involve the construction of 9 bridges of total length 480m, 3 grade separated crossings and the reconstruction of 11 at-grade intersections. In the study, the environmental impacts of the project were examined and evaluated and appropriate measures in order to tackle these effects were suggested.

Assignment Authority: MEPW

Study on the improvement of the National Road No 53 (EIAS 275)

Study on the improvement of the National Road No 53 from Ari hill to M. Dereio, Evros Prefecture (EIAS 275):

This study constitutes the EIAS of the improvement and reconstruction of the existing National Road No 53 over a length of 20Km, between Ari hill and Megalo Dereio settlement, in Evros Prefecture. Engineering works also involve the construction of 6 bridges of total length 388m, 7 at-grade intersections and retaining walls of total length of 1768m. In the study, the environmental impacts of the project were examined and evaluated and appropriate measures in order to tackle these effects were suggested.

Assignment Authority: Region of Eastern Macedonia – Thrace