Environmental impact assesment

Construction of a Pumping Station to supply the reservoirs of the Municipalities of Kilada and Krannonas in the Prefecture of Larissa (EIAS 244)

Construction of a Pumping Station to supply the reservoirs of the Municipalities of Kilada and Krannonas in the Prefecture of Larissa (EIAS 244):

This study constitutes the Environmental Impact Preassessment Study (EIpAS) of the construction and operation of the Pumping Station.  The main objective of the project is to extract water of total volume of 3.000.000 m³ from Pinios river through pumping, during the winter, and store it in the two reservoirs of the Municipalities of Kilada and Krannonas, for summer irrigation. The Station will be constructed on the right bank of Pinios river, near the hill Magoula (altitude +91,75 m) at a distance of approximately 700 m northwest of it.

Assignment Authority: Prefecture of Larissa, Administration of Land and Water Reclamation

 

Construction of a retaining wall and walking corridor in the settlement of Plytra of Asopos Municipality (ΕIAS 245)

Construction of a retaining wall and walking  corridor in the settlement of Plytra of Asopos Municipality (ΕIAS 245):

This study constitutes the EIAS of the above project. The planned projects involve the construction of a retaining wall on the top of it  a paved footway parallel to the beach will be formulated. A wooden construction for the shaping of the entrance to the beach «Pachiamo», and a wooden corridor on the beach will also be constructed. The projects take up an area of 973,57 m2 and a length of 492,5 m. In the study, the environmental impacts of the project were examined and evaluated and appropriate measures in order to tackle these effects were suggested.

Assignment Authority: Region of Peloponisos, Prefecture of Laconia, Municipality of Asopos

Wind farm of 2,4 MW installed power in the Municipality of Skopelos (EIAS 246)

Wind farm of 2,4 MW installed power in the Municipality of Skopelos, Magnesia Prefecture (EIAS 246A&B):

These studies constitute the EIpAS and the EIAS of the construction and operation of a wind farm in the aforementioned location.

The wind farm involves 3 wind turbines of 0,8MW power each. The wind farm spreads over an area of 9,1 ha with altitude ranging from 556-566m. The total net energy production of the farm is 5,3GWh
 
Assignment Authority:  Private

Water reservoirs in the locations Deleria, Kalo Nero, Agia Triada and Agios Antonios in the Larissa Prefecture (EIAS 247, 248, 249, 250)

Water reservoirs in the locations Deleria, Kalo Nero, Agia Triada and Agios Antonios in the Larissa Prefecture (EIAS 247, 248, 249, 250):

These studies constitute the EIpAS of each reservoir and were prepared within the framework of a contract entitled «Preassessment  and Final Studies of the reservoirs in the Prefecture of Larissa in the locations: a) Deleria - Begdeni Stream b) Kalo Nero, c) Agia Triada, d) Agios Antonios». The Deleria Reservoir has a total storage capacity of 6,9x106 m3 and will irrigate 1300ha of agricultural land. Kalo Nero Reservoir has a total storage capacity of 0,9x106 m3 and will irrigate 110ha of agricultural land. Agia Triada Reservoir has a total storage capacity of 0,7x106 m3 and will irrigate 116,2ha of agricultural land. Agios Antonios Resrvoir has a total storage capacity of 1,9x106 m3 and will irrigate 244ha of agricultural land..

Assignment Authority: MAD&F, Directorate of Technical Studies and Constructions

Connection of the commercial warehouses of TRANSCOMBI EXPRESS S.A. with the railway station of Oinoi (EIAS 251)

Connection of the Industrial Areas of Thisvi and Oinofyta with the rail network (Phase A). Connection of the commercial warehouses of TRANSCOMBI EXPRESS S.A. with the railway station of Oinoi (EIAS 251):

This study constitutes the EIpAS of the construction and operation of a single rail track of length 12,5Km for freight train service that connects the TRANSCOMBI EXPRESS S.A.  with the Oinoi railway station.

 
Assignment Authority: HRO  S.Α.

Soil erosion protection works in the industrial park of Schisto (EIAS 252 & 287)

Soil erosion protection works in the industrial park of Schisto  (EIAS 252 & 287):

These studies constitute the EIpAS and the EIAS of the construction and operation of the aforementioned works. The works involve stream canalization of total length of 300m and storm water drainage collectors of total length of 150m.

Assignment Authority: MANAGEMENT OF THE INDUSTRIAL PARK OF SCHISTO S.A.