Environmental impact assesment

Implementation of necessary actions for the project "Improvement of the 38th N.R. Soulinary – Kremmydia-Koryfasio (EIAS 298)

Implementation of necessary actions for the project "Improvement of the 38th N.R. Soulinary – Kremmydia-Koryfasio up to the 9th National Road, Limits of Ilia county – Kalo Nero – Kiparissia –Pylos –Methoni" (EIAS 298Α & 298Β):

These studies constitute the EIpAS and the EIAS of the abovementioned project aiming to improve the geometrical characteristics and the width of the road, in order to achieve safety and convenience of the circulation. The total length of the road studied was 13,8km and the width of the road was 11m. The study examined and evaluated the environmental impacts of the project and appropriate measures were suggested.

Assignment Authority: Prefectural Unit of Messinia

Αpproval Number EIpAS: 524/8-6-2010

Drilling well excavation on the provincial road Paliouria-Elati in Deskati Municipality (EIAS 299)

Drilling well excavation on the provincial road Paliouria-Elati in Deskati Municipality of Grevena county (EIAS 299):

The abovementioned EIpAS concerns the excavation of a water drill 250m deep, on the provincial road Paliouria-Elati, on the limits of Grevena-Kozani county, in an area of Palioyria M.D., Deskati Municipality and of 38.000m3 annual maximum capacity. The drilling is part of the rehabilitation projects of the existing water supply network of Paliouria M.D. which are covered by Ilarionas dam lake. The project is provided by the approved E.T. of the dam.

Assignment Authority: PPC S.A.

Αpproval Number: Α.Π  42902/531/2-8-2010

Crete Northern Road (CNR): Section: Pahia Ammos-Afhenas Agathias, Subsection: Frouzi Bridge – Pahia Ammos (EIA 221)

Crete Northern Road (CNR): Section: Pahia Ammos-Afhenas Agathias, Subsection: Frouzi Bridge – Pahia Ammos (EIA 221):

The project concerns the improvement of the road section Frouzi bridge – Pahia Ammos. The section has a total length of 6.556m. The existing road has currently a width of 6-7m and unfavorable geometry, while it passes through a series of settlements. Thus there is an immediate need to improve the CNR in this section. It is noted that the road design has taken into account the recently modified limits of a very important archaeological site, the site of Gournia. The major engineering works include 5 bridges, 1 twin tunnel, 3 underpasses and 1 interchange. Prepared fοr: MITN-GSPW /SSPW/CNR

Upgrading the North Road Axis of Crete (NRAC) into a motorway. Anopoli Interchange (ΕIAS 222 &222B)

Upgrading the North Road Axis of Crete (NRAC) into a motorway. Anopoli Interchange (ΕIAS 222 &222B):

This study constitutes the EIAS of the construction and operation of Anopοli Interchange on the section Tomprouk-Gournes of NRAC. The NRAC is the main road connecting Crete and it crosses the entire northern part of the island from Kissamos in the western edge to Sitia in the eastern one. NRAC is part of the Greek national road network. Anopoli Interchange is located in Gouves Municipality of Herakleion Prefecture. The study is conducted in the framework of the refurbishment and upgrade of the NRAC into to Motorway.

The project involves the construction of a half clover-leaf Interchange on NRAC along with the reconstruction of the local road network and the construction of 3 at-grade intersections on the local network. The total length of road works is 4km

Assignment Authority: MEPW-SSPW/NRAC

Solar Park in Viotia (EIA 223)

Solar Park of 661,5 KW installed capacity in the municipal department of Prosilio, Municipality of Chaeronea, Viotia Prefecture (EIA 223):

This study constitutes the EIpAS of the above project. The project will be located within a plot of total surface area of approximately 1,2ha. The park will operate as an independent power production unit and will consist of 3.780 photovoltaic panels of 175wp power each. The annual net production of the park has been estimated at 0,94 GWh.

Assignment Authority:  Private

Solar Park in Viotia (EIA 224)

Solar Park of 934,5KW installed capacity in the municipal department of Prosilio, Municipality of Chaeronea, Viotia Prefecture (ΕIA 224):

This study constitutes the EIpAS of the above project. The project will be located within a plot of total surface area of approximately 1,8ha. The park, will operate as an independent power production unit and will consist of 5.340 photovoltaic panels. The annual net production of the park has been estimated at 1,296 GWh.

Assignment Authority:  Private