Construction of Mylorema Dam at Mavrolithi in the greater Livadero Area – in Prefecture of Drama (EIA 317):
Mylorema dam will serve the water supply needs of the city of Drama. The whole project is divided into the following sections: Dam, 64m in height, water reservoir with a capacity of 2.3 million cubic meters, water transfer pipeline, water treatment plant and small hydropower project (SHP) to produce energy that will offset the energy needs for water treatment.
Prepared fοr: Prefecture of Drama (subcontractor)