Construction and operation of the Thessaloniki Outer Ring Road, from Chortiatis Interchange to the New and Existing Nationals Roads "Thessaloniki - Galatista - Poligiros' (EIA 335):
This is one of more than 10 studies implemented in the framework of a Framework Agreement with Egnatia Odos S.A This particular study concerns the construction and operation of the road section 59.4.3 i.e a highway of a total length of 11,6 km, excluding the airport connection section with a total length of 3,2 km and Thermi - N. Redestos connection of 2,5 km. The width of the highway is 21,5 m. The structures along the alignment include 4 bridges of total length 861m, 4 twin tunnels with a total length of 2,4Km and 2 Cut & Covers with a total length of 360m as well as 3 intersections. The study assessed the environmental impacts of the construction and operation of the project and proposed appropriate mitigation measures.
Assignment Authority: Egnatia Odos SA