Delineation Study of streams in the area of Thermal Power Station in South Rhodes (TES 139):
The purpose of this study is the delineation using hydraulic and environmental criteria, of streams located in an area where PPC intends to build a new thermal power station on the island of Rhodes. The total length of streams delineated is 1.260m and the catchment area amounts to 3,200 acres.
Prepared for: PPC S.A/ Thermal Projects Engineering Construction Department