Studies of streams delineation

Delineation Study in the area of LARCO Mines(TES 128)

Delineation Study in the area of  LARCO Mines(TES 128):

Purpose of the study is the stream delineation using hydraulic and environmental criteria in the wider area of  Larko mines. The polygonal lines are plotted at both sides of the stream axis (ecological line and flood line).

Assignment Authority: Private

 

Delineation Study of "Kouvelorema" stream of Megalopoli SES. (TES 131)

Delineation Study of "Kouvelorema" stream in the area of the 5th unit of  thermal station of Megalopoli SES. (TES 131):

PPC S.A. will construct a new Combined Cycle Unit in Megalopolis in an area of its property, which is adjacent to Kouvelorema stream. To meet the design requirements of the Unit it is necessary to canalize and delineate the stream. The aim of this study is to plot the polygonal lines at both sides of the deep line of the stream, which surround the flood lines the banks, and any natural or artificial elements, which are an integral part of the stream.

 
Assignment Authority: PPC S.A.

Delineation Study of Aliveri stream (TES 132)

Delineation Study of Aliveri stream (TES 132):

PPC S.A. will construct a New Unit in Aliveri SES (Νο 5)in its property. The project is adjacent to a stream with catchment 2,45Km2. Aim of the technical study is the delineation through hydraulic and environmental criteria the abovementioned stream.

Assignment Authority: PPC S.A.