Studies of streams delineation

FLOOD PROTECTION STUDY FOR THE POWER PLANT OF THIRA

The purpose of this study is the detailed design, of necessary flood protection works at a small stream, in the island of Santorini (Thira), adjacent to the Power Production Plant. The study considered technical alternatives for confronting the issues created by the overflow of the water stream, by improving its hydraulic capacity. The stream is located close to the settlement Monolithos in Thira island, approximately 500m from sea front.

Assignment Authority: PPC SA

Delineation study of "Diateni" stream in the area of the Autonomous Power Station of Karpathos island (TM145):

The purpose of the study is the delineation of the lower part Diateni stream through hydraulic and environmental criteria. The stream is at the area of the Autonomous Power Station of Karpathos (total capacity of 19,404 MW) island operated by PPC, at the Vrondi site of the Municipality of Karpathos. The length of the stream delineation is approximately 450m.

Assignment Authority: PPC SA

Recording final design modifications of Unit V of Megalopolis B ' in relation to the approved EIA (TM 144)

The purpose of this environmental study is to record the differences in the final design of the Power Plant V of Megalopolis B with respect to the design that was environmentally approved through the EIA of 2009. The purpose of the study was to assist the Environmental Authority's decision on whether an amendment of the approved EIA is required or not. Power Plan V is a Combined Cycle Power Plant with a maximum net power capacity of 815 MWe, using Natural Gas as a fuel. The project is located at “Kouvelia” site of the Municipality of Megalopolis, Arcadia Regional Unit. The study examined and assessed the environmental impacts resulting from the final design modifications.

Assignment Authority: PPC SA

Delineation Study of stream "Tholorema" within the area of Samos Autonomous Power Station (APS) (TR 143)

The study aims at the delineation with hydraulic and environmental criteria of stream Tholorrema, flowing through the Samos APSand which is arranged. The APS  is located near the village of Kokkari Samos and its total capacity is  49,630 MW. The length of delineated stream is approximately 518m.

Assignment Authority: PPC S.A.

Study of Delineation of streams "Water Lago" and "Sideritis Lago", on the site Old Galini - Korakia, North Crete (TM 141)

The object of study is the delineation of streams based on hydraulic and environmental criteria, located near the area  where the PPC intends to build a new power plant burning natural gas and alternatively light diesel at Korakia, Fodele Heraklion. Its  total capacity will be 520 MW.

The aims of the study are, based on the existing legal framework and its interpretation by the Council of State, the mapping of polygonal lines on both sides of the deep line of streams which surround flood lines, banks, and any natural or artificial elements, forming an integral part of of streams.

 

Assignment Authority: PPC S.A.

Delineation studies in the framework of the study “Urban design extension study of the community of Anthousa” .(TES. 130)

The project provides for the delineation of 5 streams within the administrative boundaries of the Community. The objective of study is the delineation, with hydraulic and environmental criteria of the above streams, for the purposes od the urban design study.

Prepared for: Municipality of Pallini/ Municipal Unit of Anthousa

 

Approval Number: AP 13115/21-3-2012