Hydraulic works

KOS ISLAND INTERNATIONAL AIRPORT "IKOPOKRATIS" (KGS), TECHNICAL STUDY FOR DESIGNATING THE WATER RECIPIENT (T.S. 155)

KOS ISLAND INTERNATIONAL AIRPORT "IKOPOKRATIS" (KGS), TECHNICAL STUDY FOR DESIGNATING THE WATER RECIPIENT (T.S. 155)

The report was drafted in order to accompany the relevant request for the designation of the  recipient body of  the disposal of the processed urban non-hazardous waste water from the existing sewage treatment plant of Kos Island International Airport.

The report provides technical data on the following:

Hydraulic and pollutiion design data of the sewage treatment plant,

Technical description of the sewage treatment plant,

Technical description of disposal works for treated wastewater,

Results of analyzes of treated wastewater for the years 2014-2015,

Compliance data with the existing legal framework.

Assignment Authority: Civil Aviation Authority.

KEFALONIA INTERNATIONAL AIRPORT (KIA): TECHNICAL STUDY FOR LICENSING OF THE PROJECT: REUSE OF TREATED EFFLUENTS FOR RESTRICTED IRRIGATION (T.S. 154)

KEFALONIA INTERNATIONAL AIRPORT (KIA): TECHNICAL STUDY FOR LICENSING OF THE PROJECT: REUSE OF TREATED EFFLUENTS FOR RESTRICTED IRRIGATION (T.S. 154)

The report was drafted in order to accompany the relevant request for a permit for reuse of the treated urban non-hazardous waste water from the existing sewage treatment plant at Kefalonia International Airport for  restricted irrigation of a small park, within the airport area.

The report provides technical data on the following:

Hydraulic and pollution design data of the sewage treatment plant,

Technical description of the sewage treatment plant,

Technical description of disposal works for treated wastewater,

Results of analyses of treated wastewater for the years 2014-2015,

Compliance data with the existing legal framework.

Assignment Authority: Civil Aviation Authority.

ASSESSMENT OF THE TECHNICAL INFRASTRUCTURE IN WATER MANAGEMENT OF THE NATIONAL PARK OF SCHINIAS-MARATHON (T.S. 153A & B)

ASSESSMENT OF THE TECHNICAL INFRASTRUCTURE IN WATER MANAGEMENT OF THE NATIONAL PARK OF SCHINIAS-MARATHON (T.S. 153A & B)

This report refers to the Assessment of the Technical Infrastructure (hydraulic) of the National Park of Schinias-Marathon. The purpose of the study was to test the technical infrastructure and submit proposals for reconstruction and improvement, to prioritize them in terms of implementation and to submit reconstruction costs.

Assignment Authority: National Park of Schinias-MarathonManagement Organization.

Study of local settlement projects and examination of the relative environmental impacts, on the downstream part of the alignment, in the region of Evros Delta (TES 114)

The study aims to examine the necessary works for the prevention of salinity in the Evros River delta area. This study proposed the construction of a small dam from reinforced concrete, close to the location of a pre existing earth dam, 5 km from the river mouth.

Prepared for: Prefecture of Evros

Stormwater sewerage network study in Nikiza area (TES 136 & 137)

Stormwater sewerage network study in Nikiza area (TES 136 & 137):

Hydraulic study for stormwater sewerage network in Nikiza area . Rainwater pits and underground tube conductors of total length 2111m (Φ800-Φ500) were designed for the drainage of an 9,6 ha area. The hydraulic studies, the Health and Safety Plan (HSP), the Health and Safety File (HSF)and the tender documents were prepared.

Prepared for: Municipality of Pallini/ Municipal Unit of Anthousa

Preliminary Study of wastewater treatment plant in Corfu (TES 105 & 117)

Preliminary Study of wastewater treatment plant of the SHA settlement in Corfu (TES 105 & TES 117):

The study concerns the construction of a common wastewater treatment plant for a new housing development project including the municipal wastewater from a neighboring area. The design population is  1300 inhabitants (pe) while the average sewage flow amounts to 260 m3 per day.

Assignment  Authority: SHA
  • 1
  • 2