AMENDMENT OF THE DAET OF THE ROAD SECTION “I/C NEA MOUDANIA – POTIDAIA BRIDGE” OF EGNATIA ROAD

This study concerns the project of construction and operation of the road section I/C Nea Moudania- Potidaia Bridge” (Section 58.4.1) of the vertical axis 58, of Egnatia Odos road . The aim of the amendment was to examine the environmental impacts and propose appropriate mitigation measures for the following works:

• extension of the road section to include the N. Moudania I/C,

• new design of the N. Moudania I/C and

• new service roads (SR1 195m and SR2 277m)

Assignment Authority: EGNATIA ODOS SA