ENVIRONMENTAL IMPACT ASSESSMENT OF THE PROJECT "CONNECTION OF THE ROAD POLYGYROS-IERISSOS WITH OF SITHONIA ROAD, SECTION: Kelli - Nikiti" (EIAS 370)

ENVIRONMENTAL IMPACT ASSESSMENT OF THE PROJECT "CONNECTION OF THE ROAD POLYGYROS-IERISSOS  WITH  OF SITHONIA ROAD, SECTION: Kelli - Nikiti" (EIAS 370)

The Environmental Impact Assessment Study refers to a new road axis / vertical road linking the Thessaloniki-Ierissos road to the Sithonia roadway, 23.79 km long and 11.00 m wide. The side and vertical network is 6.34 km long in total.

The study assessed the environmental impacts of the construction and operation of the project and suggested appropriate mitigation measures.

Assignment Authority: Region of Central Macedonia