Solid Waste Management Studies

Technical Reports for the Environmental Authorization of RECD Units within the premises of Airports Skiathos “Al. Papadiamantis”, Mykonos, Zakynthos “Dionysios Solomos”, Cephalonia, Santorini, Kos “Hippocrates”, Thessaloniki “Macedonia” and Samos “Aristarchus the Samius) (8 studies) (NRM 18):

Technical Reports for the Environmental Authorization of RECD Units within the premises of Airports Skiathos “Al. Papadiamantis”, Mykonos, Zakynthos “Dionysios Solomos”, Cephalonia, Santorini, Kos “Hippocrates”, Thessaloniki “Macedonia” and Samos “Aristarchus the Samius) (8 studies)  (NRM 18)

The Technical Reports were implemented for the Environmental Authorization of Recycling Units for Excavation, Construction and Demolition Waste (for short RECD), which INTRAKAT S.A. intends to install, within the premises of specific airports and accompany the main airport projects, while they are temporary installations, that will operate during the construction phase. The units will serve the exploitation of solid non hazardous wastes coming from the construction works.

All operation will be carried out within airport boundaries, with the purpose of alternative management of the produced waste.

Assignment Authority: Private

ΚΑΤΑΡΤΙΣΗ ΠΕΡΙΦΕΡΕΙΑΚΟΥ ΣΧΕΔΙΟΥ ΓΙΑ ΤΗΝ ΠΡΟΣΑΡΜΟΓΗ ΣΤΗΝ ΚΛΙΜΑΤΙΚΗ ΑΛΛΑΓΗ (ΠΕΣΠΚΑ) ΠΕΡΙΦΕΡΕΙΑΣ ΑΤΤΙΚΗΣ

ΚΑΤΑΡΤΙΣΗ ΠΕΡΙΦΕΡΕΙΑΚΟΥ ΣΧΕΔΙΟΥ ΓΙΑ ΤΗΝ ΠΡΟΣΑΡΜΟΓΗ ΣΤΗΝ ΚΛΙΜΑΤΙΚΗ ΑΛΛΑΓΗ (ΠΕΣΠΚΑ) ΠΕΡΙΦΕΡΕΙΑΣ ΑΤΤΙΚΗΣ

 Αντικείμενο της μελέτης είναι η εκπόνηση του Περιφερειακού Σχεδίου για την Προσαρμογή στην Κλιματική Αλλαγή (ΠεΣΠΚΑ) της Περιφέρειας Αττικής,,Το ΠεΣΠΚΑ αξιολογεί τις πιθανές επιπτώσεις (ευκαιρίες και απειλές) από την κλιματική αλλαγή, εστιάζοντας στον τρόπο με τον οποίο οι κλιματικοί κίνδυνοι ενδέχεται να εκδηλωθούν κατά τον 21ο αιώνα, ελλείψει σχετικής δράσης.

MΠE ΓΙΑ ΤΗ «ΜΕΛΕΤΗ, ΚΑΤΑΣΚΕΥΗ, ΧΡΗΜΑΤΟΔΟΤΗΣΗ, ΛΕΙΤΟΥΡΓΙΑ, ΣΥΝΤΗΡΗΣΗ ΚΑΙ ΕΚΜΕΤΑΛΛΕΥΣΗ ΤΟΥ ΒΟΑΚ ΣΤΟ ΤΜΗΜΑ ΧΑΝΙΑ -ΗΡΑΚΛΕΙΟ

MΠE ΓΙΑ ΤΗ «ΜΕΛΕΤΗ, ΚΑΤΑΣΚΕΥΗ,ΧΡΗΜΑΤΟΔΟΤΗΣΗ, ΛΕΙΤΟΥΡΓΙΑ,ΣΥΝΤΗΡΗΣΗ ΚΑΙ ΕΚΜΕΤΑΛΛΕΥΣΗ ΤΟΥ ΒΟΑΚ ΣΤΟ ΤΜΗΜΑ ΧΑΝΙΑ -ΗΡΑΚΛΕΙΟ

  

 

Το υπό μελέτη έργο αφορά στην κατασκευή και λειτουργία τμήματος του Βόρειου Οδικού Άξονα Κρήτης (ΒΟΑΚ) από Χανιά έως Ηράκλειο των Περιφερειακών Ενοτήτων (Π.Ε.) Χανίων, Ρεθύμνου και Ηρακλείου, ο οποίος στο τμήμα αυτό αναβαθμίζεται σε αυτοκινητόδρομο. Το έργο αφορά σε οδικό άξονα μήκους περί τα 107 km, συνοδό παράπλευρο οδικό δίκτυο εξυπηρέτησης, κατασκευή γεφυρών, σηράγγων, ανισόπεδων κόμβων, Κέντρων Ελέγχου Σηράγγων (ΚΕΣ), Κέντρου Λειτουργίας και Συντήρησης και κατασκευή Σταθμού Εξυπηρέτησης επιβατών (ΣΕΑ). Και περιλαμβάνει τέσσερα (4) τμήματα: το τμήμα Σούδα – Βρύσες (2Ν), το τμήμα Βρύσες – Ατσιπόπουλο (3Ν), το τμήμα Αμάρι – Σκαλέτα (5Ν) και το τμήμα Σκαλέτα – Λινοπεράματα (6Ν & 7Ν).

STUDY FOR RESTORATION OF THE LIPTOL AREA (NRMS 16)

STUDY FOR RESTORATION OF THE LIPTOL AREA (NRMS 15)

This involves the development of a Restoration Study of the area occupied by the facilities:

of the inactive  SES of the LIPTOL area

of the inactive coalbrick factory and Lignite Post-processing plant ,

of the inactive unit of Carbonization

and the related transport systems of lignite and by-products

The study includes the following sections:

Existing situation – description of establishments

General description of the equipment – materials –waste

Description of possible deactivation of mechanical/ electrical equipment

Description of possible deactivation of building infrastructure

Description of management of electromechanical equipment – materials -waste – alternative solutions

Description of demolition process of building establishments - alternative solutions

Process of demolition - Management of demolition materials – timetable

Assignment Authority: PPC SA

Actions for the implementation of the the Law on Waste Management of Extractive Industries - Contract No 23/2014 ((NRM 14)

The project’s objective is to establish guidelines and procedures concerning the inspection, the payment of a guarantee for extractive waste management facilities, the determination of the required qualifications of the person who will undertake the mining waste facility management and the required training and technical evolution of staff of such a plant.

It also includes the identification of methods for sampling and analysis needed for the technical implementation of the Law on mining waste and technical requirements relating to the definition of weak acid dissociable cyanide and its measurement methods (three Decrees and three Regulations were drafted)

Prepared for: DE-MANRE, Cyprus